India: The National Green Tribunal (NGT) has challenged the Haryana State Pollution Control Board (HSPCB) over the continued operation of KSY Buildcon's Naurangpur ready-mix concrete batching plant in Haryana’s Gurgaon district. The Hindustan Times newspaper has reported that the plant may be operating without a required authorisation for the generation of hazardous materials. Local residents previously alleged instances of wastewater and dust pollution from the plant.
A hearing on the matter is taking place on 14 July 2026.
